Kingston College life safety generator installation
Client: South Thames College Group
Project consultant: Hurley Palmer Flatt
Principle contractor: Redlands Electrical
Lift consultants: Temple lifts
Project duration: 6 weeks
This was a challenging project as the generator needed to be lifted and positioned at roof level on the 11th floor following all the necessary structural surveys. All containment and cabling was run at roof level to both lift motor rooms via automatic transfer switches and bypass switches