Kingston College Refurbishment

Kingston college summer works consisted of major refurbishment and electrical upgrades to many different areas of the college.

Duration: 8 weeks

A new commercial kitchen was installed on the 11th floor offering three phase combination ovens and new power and lighting arrangements.

The 10th floor was modernised and transformed into a student study open space providing new offices and classrooms with LED lighting, Power pole containment and Dado trunking.

New 600x600mm LED light fittings were installed in classrooms and corridors throughout the second floor transforming the working environment and also cutting energy bills by three quarters.

The engineering block consisted of a full strip out and refurbishment of the male and female toilets including new power, emergency lighting, and hand dryers.

Related Projects: